EPD Guide

<p>Practical guides to Environmental Product Declarations, EN 15804+A2, and the EPD certification process.</p>

The CBAM Authorised-Declarant Bottleneck: Why an EU Buyer Might Drop You in 2027

15 Jul 2026 · 2 min read

The CBAM Authorised-Declarant Bottleneck: Why an EU Buyer Might Drop You in 2027

From 2026, only an Authorised CBAM Declarant may import covered goods into the EU — concentrating the obligation and cost on your…

Read story →
Module D in EN 15804: The Recycling Credit Almost Nobody Gets Right

8 Jul 2026 · 3 min read

Module D in EN 15804: The Recycling Credit Almost Nobody Gets Right

Module D reports the recycling and recovery credits beyond the system boundary — and it is the EPD figure most often mis-netted…

Read story →
What a Steel Mill’s Electricity Contract Has to Do With Your Building’s BREEAM Score

1 Jul 2026 · 3 min read

What a Steel Mill’s Electricity Contract Has to Do With Your Building’s BREEAM Score

A steel mill's electricity contract quietly shapes the steel's EPD, the building's embodied carbon, and its BREEAM or LEED score — four…

Read story →
Carbon Rules Are Becoming a Trade Weapon, Not Just a Climate Tool

24 Jun 2026 · 3 min read

Carbon Rules Are Becoming a Trade Weapon, Not Just a Climate Tool

The EU's CBAM went live in 2026, the UK follows in 2027, and Canada, Australia and US bills are moving the same…

Read story →
The CBAM Verifier Crunch: Why Verification Capacity Will Be Tight Before the 2027 Deadline

17 Jun 2026 · 3 min read

The CBAM Verifier Crunch: Why Verification Capacity Will Be Tight Before the 2027 Deadline

Accredited CBAM verifiers are not expected in numbers until autumn 2026, yet every 2026-import dataset using actual values must be verified before…

Read story →
How to Read an EPD Like an Auditor: 7 Red Flags That Should Make You Reject One

10 Jun 2026 · 3 min read

How to Read an EPD Like an Auditor: 7 Red Flags That Should Make You Reject One

Specifiers take the carbon number on an EPD at face value — they should not. The seven things an experienced verifier checks…

Read story →
CBAM, EPD, DPP, PEF, CSRD, EPBD: Which Carbon Document Do You Actually Need?

4 Jun 2026 · 6 min read

CBAM, EPD, DPP, PEF, CSRD, EPBD: Which Carbon Document Do You Actually Need?

Carbon-document fatigue is real: by 2027 one steel product can sit inside CBAM, an EPD, a Digital Product Passport, PEF, CSRD and…

Read story →
CBAM Is Coming for Fabricated Steel: What the Proposed 2028 Downstream Extension Means

4 Jun 2026 · 7 min read

CBAM Is Coming for Fabricated Steel: What the Proposed 2028 Downstream Extension Means

The European Commission has proposed extending CBAM to ~180 downstream goods from 2028 — including structural steel, bolts and prefabricated steel buildings.…

Read story →
What CBAM Actually Costs: How It Is Calculated, the 2026–2034 Ramp, and Why There Is No US Exemption

30 May 2026 · 6 min read

What CBAM Actually Costs: How It Is Calculated, the 2026–2034 Ramp, and Why There Is No US Exemption

How a CBAM bill is calculated, the official 2026 certificate price and phase-in factors, how the cost ramps from about EUR 3…

Read story →
EPD and CBAM: What an EPD Does — and Does Not — Do for Carbon Border Compliance

27 May 2026 · 9 min read

EPD and CBAM: What an EPD Does — and Does Not — Do for Carbon Border Compliance

An EPD does not satisfy CBAM, and its carbon figure is not a CBAM value. A precise, 2026-current guide for steel and…

Read story →

Is your company ready
to be in this list?